JLW // PROJECT FORGECONTROLLED BUILD PROGRAM
Ideas enterthe forge.Proven systems emerge.
Nineteen connected workstreams transforming a powerful homelab into a resilient, observable, recoverable, and increasingly intelligent platform.
19Workstreams
10Verified
01Active build
08Current scope remaining
PROJECT CONTROL // OVERHAULACTIVE
CURRENT FOCUSWS12IDENTITY + WEBSITE
01020304050607080910111213141516171819
Program activeCurrent focus: WS12Verified foundations retainedFinal acceptance remains open
JLW-001FLAGSHIP BUILD
Server situation overhaul
One platform. Nineteen controlled transformations.
The program joins recovery, security, observability, networking, identity, AI, household services, and final validation without confusing installation with proof.
FOUNDATION10 / 19workstreams verified
Workstream register
The complete build sequence.
Titles and states mirror the established project record. Detailed implementation evidence remains inside the protected documentation system.
Verified Building Ready Open Future
WS01Verified
Proxmox Automated VM Backups
WS02Verified
Synology Snapshots
WS03Verified
Immich Database Backups
WS04Verified
Nextcloud Backup Automation
WS05Verified
AMP and Game-Server Backup Infrastructure
WS06Verified
Full Backup Restore Test
WS07Verified
Network Segmentation, Firewall, Perimeter Protection, and Baseline Hardening
WS08Verified
Infrastructure Services Baseline
WS09Verified
Monitoring and Centralized Logging
WS10Verified
DNS Filtering
WS11Future
Node-RED Evaluation
WS12Building
Website, Identity, and Living Documentation
WS13Ready
GPU Hardware
WS14Ready
AI Server Foundation
WS15Ready
Ollama and Open WebUI
WS16Ready
Dedicated Storage Network
WS17Open
UPS Integration
WS18Ready
Internal AI Operations and Household Agent
WS19Ready
Household Dashboard and Final Validation
WS11 remains reserved for continuity and has been transferred to future evaluation. Workstream numbering has not been reassigned.
JLWorkz build doctrine
Nothing is complete because it was installed.
Every stage protects the current system, makes a bounded change, validates the result, and preserves the evidence needed to understand or recover it later.
- 01Define
- 02Protect
- 03Build
- 04Prove
- 05Document
Beyond the current overhaul
The next horizon is already taking shape.
FUTURE REGISTER17ideas retained for evaluation
These projects preserve good ideas without allowing them to expand the current build. Each remains unapproved until it receives its own scope, planning, security review, recovery design, and acceptance criteria.
FP-001Evaluate later
Automatic Power Coordination Failover
FP-002Evaluate later
Self-Hosted Email Server
FP-003Evaluate later
Self-Hosted Password Manager
FP-004Evaluate later
Household Document Management
FP-005Evaluate later
Computer and Phone Backup Coverage
FP-006Evaluate later
Encrypted Off-Site Recovery
FP-007Evaluate later
Local Home Automation
FP-008Evaluate later
Local Voice Assistant
FP-009Evaluate later
Household Media Library
FP-010Evaluate later
Self-Hosted Calendars and Contacts
FP-011Evaluate later
Household Assets and Maintenance
FP-012Evaluate later
Security Monitoring Expansion
FP-013Evaluate later
Controlled Update Management
FP-014Evaluate later
Power and Infrastructure Resilience
FP-015Evaluate later
3D Printing Workflow
FP-016Evaluate later
Native Windows Recovery Tooling
FP-017Transferred
Node-RED Evaluation
NOT CURRENT SCOPEListing an idea here does not approve implementation, purchases, scheduling, or priority. Selection begins only after the current overhaul is accepted and closed.
PUBLIC PROJECT VIEWWorkstream titles and high-level states are public. Internal addressing, host identifiers, management paths, firewall configuration, logs, backup locations, security controls, and recovery procedures remain protected.
View operational status